皇冠代理网址:Fukushima debris removal delayed by another year

新2网址大全www.hg108.vip)实时更新发布最新最快最有效的新2网址和新2最新网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

皇冠代理网址www.hg9988.vip)是一个开放皇冠代理网址即时比分、皇冠手机网址代理最新登录线路、皇冠手机网址会员最新登录线路、皇冠网址代理APP下载、皇冠网址会员APP下载、皇冠网址线路APP下载、皇冠网址电脑版下载、皇冠网址手机版下载的皇冠新现金网平台。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

添加回复:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。